STIRRING STUFF
COSMETIC MANUFACTURING PLANT
Full design and construct electrical, equipment, and machinery package for 1,000m² warehouse.
Conducted equipment and site maximum demand calculations.
Facilitated 400A site power upgrade with Energex infrastructure for current and future load requirements.
Supplied and installed 400A MSB and 400A internal DB.
Supplied and installed electrical and communication systems throughout the site.
Supplied and installed a 100kW solar system.
Provided ongoing maintenance support.
Client: Stirring Stuff
Year: 2025